Power Project & RE Project Interview Question and Answer
In this article, we will delve into an exploration of the various categories of interview questions commonly encountered in the context of RE (Rural Electrification) Projects pertaining to the field of Electrical Engineering. The information presented in this article holds considerable value for professionals working in various engineering fields including supervisors, senior supervisors, junior engineers and senior engineers.
A: 3x50, 1x35, 1x16 SQ.MM or 3x70, 1x50, 1x16 SQ.MM
Q: 50 SQMM LT ABC Current Carrying Capacity?
A: 149 Amp
Q: 70 SQMM LT ABC Current Carrying Capacity?
A: 192 Amp
Q: Weight of 1 KM 50 SQMM LT AB Cable?
A: 640 to 670 KG
Q: Size of HT ABC ?
A: 3x95, 1x70 SQ.MM
Q: How many Service Connections can be Connected in a Deep Drawn Box?
A: 10 Nos.
Q: 1 KM LT AB Cable Estimate?
A: Estimate for 50 SQ MM LT AB Cable.
A: 570 KG
Q: Mass of Oil in 63 KVA DTR?
A: 135 KG
Q: 63 KVA DTR Amperes in HT/LT Side?
A: HT: 3.31 Amp, LT: 84.00 Amp
Q: Weight of 100 KVA DTR?
A: 730 KG
Q: Mass of Oil in 100 KVA DTR?
A: 215 KG
Q: 100 KVA DTR Amperes in HT/LT Side?
A: HT: 5.25 Amp, LT:133.34 Amp
Q: Which Oil used in Transformer?
A: Mineral oil and Synthetic oil
Q: Ground to A.B Switch Handle Distance?
A: 1200 MM
Q: Pole to Pole Length of 100 KVA DTR DP?
A: 2100 MM
Q: Pole to Pole Length of 63 KVA DTR DP?
A: 1200 MM (1.2 Meter)
Q: Pole to Pole distance of Bay DP?
A: 2100 MM (2.1 Meter)
Q: Pole to Pole distance of line Sectionlizer?
A: 1800 MM (1.8 Meter)
Q: 11 kV Disc Insulators Failing Load?
A: 45 KN
Q: 11 KV Polymer Pin Insulator Bending Load?
A: 5 KN
Q: 11 KV Phase to Phase Distance?
A: 750 MM (for V Becket) 1050 MM (for DP)
Q: Safe Distance of 11 KV Line to LT Line?
A: 2.44 Meter
Q: 11 KV Line DP TOP Channel Length?
A: 2250 MM (75x40 mm)
Q: 11 KV Line DP Cross bracing Length?
A: 2385 MM (50x50x6 mm)
Q: 11 KV Line DP Horizontal Bracing Length?
A: 1440 MM (50x50x6 mm)
Q: Cradle Guard Channel Length?
A: 2350 MM (75x40 mm)
A: Purchase Order
Q: BG full form?
A: Bank Guaranty
Q: JCR full form?
A: Job Cost Report
Q: D.I full form?
A: Delivery Instruction
Q: SBD full form?
A: Standard Bidding Documents
Q: ACSR full form?
A: Aluminum Conductor Steel Reinforced
Q: RCC full form?
A: Reinforced Cement Concrete
Q: PVC full form?
A: Poly Vinyl Chloride
Q: PLCC full form?
A: Power Line Carrier Communication
Q: JMC full form?
A: Joint Measurement Certificate
Q: PG CLAMP full form?
A: Parallel Groove Clamps
Q: VCB full form?
A: Vacuum Circuit Breaker
Q: CT full form?
A: Current Transformer
Q: DVC full form?
A: Damodor Vally Corporation
Q: ABC full for?
A: Aerial Bunched Cable
Q: TPGO full form?
A: Triple Pole Gang Operating
Q: AACSR full form?
A: Aluminum Alloy Conductor Steel Reinforced
Q: BDV full form?
A: Break Down Voltage
Q: RCCB full form?
A: Residual Current Circuit Breaker
Q: UPS full form?
A: Uninterrupted Power Supply
Q: LTDB full form?
A: Low Tension Distribution Box
Q: MLDB full form?
A: Main Lighting Distribution Board
Q: CBCU full form?
A: Circuit Breaker Control Unit
Q: EHV full form?
A: Extra High Voltage
Q: GIS full form?
A: Gas Insulated Substation
Q: MVA full form?
A: Mega Volt Ampere
Q: LA full form?
A: Lightning Arrester
Q: OLR full form?
A: Over Load Relay
Q: MV full form?
A: Medium Voltage
Q: HRC full form?
A: High Rupturing Capacity Fuse
Q: AMR full form?
A: Automated Meter Reading
Q: FMS full form?
A: Feeder Monitoring System
Q: G.O Switch full form?
A: Gang Operated Switch
Q: A.B Switch full form?
A: Air Break Switch
Q: IEEMA full form?
A: Indian Electrical & Electronics Manufacturers' Association
Q: SMC full form?
A: Sheet Molding Compound Box
Q: PF full form?
A: Provident Fund
Q: PDF full form?
A: Portable Document Format
Q: PESTLE full form?
A: Political, Economical, Social, Technological, Legal, Environmental
Q: FIR full form?
A: First Information Report
Q: ASAP full form?
A: As Soon As Possible
Q: CAD full form?
A: Computer Added Drawing
Q: LA full form?
A: Letter of Award
Q: APDRP full form?
A: Accelerated Power Development and Reforms Program
Q: CMD full form?
A: Chairman and Managing Director
Q: CEO full form?
A: chief executive officer
Q: DPR full form?
A: Detailed Project Report
Q: NCR full form?
A: Non Compliance Report
Q: JIR full form?
A: Joint Inspection Report
Q: FQP full form?
A: Field Quality Plan
Q: PDCA full form?
A: Plan Do Check Act
Q: NSC full form?
A: National Safety Council
Q: PTP full form?
A: Pre Task Plan
Q: LOI full form?
A: Letter of Indent
Power Project & RE Project Interview Question and Answer
POLE Related Questions and Answers
Q: Weight of 8 meter PCC Pole?A: 400 Kg. (Tension- 200 KGN)
Q: Weight of 9 meter PCC Pole?
A: 700 Kg. (Tension- 400KGN)
Q: 8 Mtr PCC Pole Specification?
A: Pole Weight- 400 KG, Pole Tension- 200 KGN, Top Width- 150 MM, Bottom Width-280, Bullet size- 100 MM
Q: 9 Mtr PCC Pole Specification?
A: Pole Weight- 700 KG, Pole Tension- 400KGN, Top Width- 230, Bottom Width- 410 MM, Bullet Side- 100 MM
Q: Dimension of Base Plate?
A: 450x450x75 MM, 500x500x100 (WBSEDCL)
Q: How long is the Pole under the ground?
A: 1.5 meter
Q: 8 meter Pole Dimention?
A: Top Width- 150 MM, Bottom Width- 280 MM, Thickness- 100 MM
Q: Weight of 9 meter PCC Pole?
A: 700 Kg. (Tension- 400KGN)
Q: 8 Mtr PCC Pole Specification?
A: Pole Weight- 400 KG, Pole Tension- 200 KGN, Top Width- 150 MM, Bottom Width-280, Bullet size- 100 MM
Q: 9 Mtr PCC Pole Specification?
A: Pole Weight- 700 KG, Pole Tension- 400KGN, Top Width- 230, Bottom Width- 410 MM, Bullet Side- 100 MM
Q: Dimension of Base Plate?
A: 450x450x75 MM, 500x500x100 (WBSEDCL)
Q: How long is the Pole under the ground?
A: 1.5 meter
Q: 8 meter Pole Dimention?
A: Top Width- 150 MM, Bottom Width- 280 MM, Thickness- 100 MM
Q: 9 meter Pole Dimention?
A: Top Width- 230 MM, Bottom Width- 410 MM, Thickness- 100 MM
A: Top Width- 230 MM, Bottom Width- 410 MM, Thickness- 100 MM
LT & LT ABC Related Question and Answer
Q: Size of LT ABC?A: 3x50, 1x35, 1x16 SQ.MM or 3x70, 1x50, 1x16 SQ.MM
Q: 50 SQMM LT ABC Current Carrying Capacity?
A: 149 Amp
Q: 70 SQMM LT ABC Current Carrying Capacity?
A: 192 Amp
Q: Weight of 1 KM 50 SQMM LT AB Cable?
A: 640 to 670 KG
Q: Size of HT ABC ?
A: 3x95, 1x70 SQ.MM
Q: How many Service Connections can be Connected in a Deep Drawn Box?
A: 10 Nos.
Q: 1 KM LT AB Cable Estimate?
A: Estimate for 50 SQ MM LT AB Cable.
- LT ABC- 01 KM
- New Pole- As Per Site Condition (06 Approx.)
- Stay Set- 15 Nos (Approx.)
- Earthing- 18-20 Nos. (Approx.)
- Dead End- 18 Nos. (Approx.)
- Suspension- 28 Nos. (Approx.)
- Deep Drawn Box 30 Nos. (Approx.)
- IPC- 130 (with out PG Clamp) (Approx.)
DTR & DTR STRUCTURE Related Question and Answer
Q: Weight of 63 KVA DTR?A: 570 KG
Q: Mass of Oil in 63 KVA DTR?
A: 135 KG
Q: 63 KVA DTR Amperes in HT/LT Side?
A: HT: 3.31 Amp, LT: 84.00 Amp
Q: Weight of 100 KVA DTR?
A: 730 KG
Q: Mass of Oil in 100 KVA DTR?
A: 215 KG
Q: 100 KVA DTR Amperes in HT/LT Side?
A: HT: 5.25 Amp, LT:133.34 Amp
Also Read : RE Project Interview Question and Answer
Q: Which Oil used in Transformer?
A: Mineral oil and Synthetic oil
Q: Ground to A.B Switch Handle Distance?
A: 1200 MM
Q: Pole to Pole Length of 100 KVA DTR DP?
A: 2100 MM
Q: Pole to Pole Length of 63 KVA DTR DP?
A: 1820 MM
Q: Per Meter Weight of 100x50x6 Channel?
A: 9.56 Kg/m
Q: Danger Board Size?
A: 200 x 250 MM
Q: Size of Flat using in DTR Earthing?
A: 25x3 MM
Q: Pipe to Pipe Distance for Pipe Earthing?
A: 3 Meter.
Q: Pipe Earthing Length?
A: 3050 MM
Q: Pipe Earthing Dia?
A: 40 MM
Q: How many Clamps Required for a DTR Structure?
A: 26 Nos. (with out Stay Clamp)
Q: T OFF Channel Length (75x40 MM)?
A: 1800 MM
Q: 63 KVA DTR Top Channel Length?
A: 2060 MM
Q: 100 KVA DTR Top Channel Length?
A: 2340 MM
Q: Cradle Guard Channel Length?
A: 2350 MM (75x40 mm)
Q: Per Meter Weight of 100x50x6 Channel?
A: 9.56 Kg/m
Q: Danger Board Size?
A: 200 x 250 MM
Q: Size of Flat using in DTR Earthing?
A: 25x3 MM
Q: Pipe to Pipe Distance for Pipe Earthing?
A: 3 Meter.
Q: Pipe Earthing Length?
A: 3050 MM
Q: Pipe Earthing Dia?
A: 40 MM
Q: How many Clamps Required for a DTR Structure?
A: 26 Nos. (with out Stay Clamp)
Q: T OFF Channel Length (75x40 MM)?
A: 1800 MM
Q: 63 KVA DTR Top Channel Length?
A: 2060 MM
Q: 100 KVA DTR Top Channel Length?
A: 2340 MM
Q: Cradle Guard Channel Length?
A: 2350 MM (75x40 mm)
HT, LINE DP & FEEDER Related Question and Answer
Q: Pole to Pole distance of line DP?A: 1200 MM (1.2 Meter)
Q: Pole to Pole distance of Bay DP?
A: 2100 MM (2.1 Meter)
Q: Pole to Pole distance of line Sectionlizer?
A: 1800 MM (1.8 Meter)
Q: 11 kV Disc Insulators Failing Load?
A: 45 KN
Q: 11 KV Polymer Pin Insulator Bending Load?
A: 5 KN
Q: 11 KV Phase to Phase Distance?
A: 750 MM (for V Becket) 1050 MM (for DP)
Q: Safe Distance of 11 KV Line to LT Line?
A: 2.44 Meter
Q: 11 KV Line DP TOP Channel Length?
A: 2250 MM (75x40 mm)
Q: 11 KV Line DP Cross bracing Length?
A: 2385 MM (50x50x6 mm)
Q: 11 KV Line DP Horizontal Bracing Length?
A: 1440 MM (50x50x6 mm)
Q: Cradle Guard Channel Length?
A: 2350 MM (75x40 mm)
HT & LT STAY Related Question and Answer
Q: Length of LT Stay Rod?
A: 1680 MM, Dia-16 MM
Q: LT Stay Plate Size?
A: 150 X 150 X 6 MM
Q: Pole Top to Guy Insulator Distance?
A: 1.5 Mtr.
Q: Size of LT Stay Wire?
A: 7/12 SWG or 7/10 SWG (It depends on approval)
Q: 7/12 SWG Stay wire weight per meter?
A: 0.308 Kg/m (Approx.)
Q: LT Guy Insulator Length?
A: 90x65 MM
Q: LT Guy Insulator Specification?
A: Size- 90x65 mm, Failing Load- 44 KN, Weight- 500 gms. Approx
A: 1680 MM, Dia-16 MM
Q: LT Stay Plate Size?
A: 150 X 150 X 6 MM
Q: Pole Top to Guy Insulator Distance?
A: 1.5 Mtr.
Q: Size of LT Stay Wire?
A: 7/12 SWG or 7/10 SWG (It depends on approval)
Q: 7/12 SWG Stay wire weight per meter?
A: 0.308 Kg/m (Approx.)
Q: LT Guy Insulator Length?
A: 90x65 MM
Q: LT Guy Insulator Specification?
A: Size- 90x65 mm, Failing Load- 44 KN, Weight- 500 gms. Approx
Also Read : Technical Specification of HT & LT Stay Sets
Q: Length of HT Stay Rod?
A: 1830 MM
Q: Dia of HT Stay Rod?
A: 20 MM
Q: HT Stay Plate Size?
A: 230 X 230 X 6 MM
Q: HT Guy Insulator Length?
A: 140 X 85 MM
Q: HT Guy Insulator Specification?
A: Size- 140x85 mm, Failing Load- 53 KN, Weight- 750 gms. Approx
A: 1830 MM
Q: Dia of HT Stay Rod?
A: 20 MM
Q: HT Stay Plate Size?
A: 230 X 230 X 6 MM
Q: HT Guy Insulator Length?
A: 140 X 85 MM
Q: HT Guy Insulator Specification?
A: Size- 140x85 mm, Failing Load- 53 KN, Weight- 750 gms. Approx
Q: Stay Wire Binding Length?
A: 225 MM
A: 225 MM
Q: 7/10 SWG Stay wire weight per meter?
A: 0.448 Kg/m (Approx.)
Q: 7/14 SWG Stay wire weight per meter?
A: 0.180 Kg/m (Approx.)
Q: How many Kg of Stay Wire is Required for a Single Stay?
A: 7/10 SWG- 4.9 Kg, 7/12 SWG- 3.38 Kg.
Q: Pole to Stay Distance?
A: 6 Mtr. (20 ft)
A: 0.448 Kg/m (Approx.)
Q: 7/14 SWG Stay wire weight per meter?
A: 0.180 Kg/m (Approx.)
Q: How many Kg of Stay Wire is Required for a Single Stay?
A: 7/10 SWG- 4.9 Kg, 7/12 SWG- 3.38 Kg.
Q: Pole to Stay Distance?
A: 6 Mtr. (20 ft)
HT & LT EARTHING Related Question and Answer
Q: Length of Earth Spike?
A: 1853 MM (1.85 Meter), 20 MM Dia.
Q: Weight of 1853 MM Earth Spike?
A: 4.5 Kg.
Q: Size of LT Earthing Wire?
A: 8 SWG (4MM)
Q: 8 SWG Wire Weight?
A: 102 gms/Meter
Q: How deep is Earth Spike Underground?
A: 500 mm
A: 1853 MM (1.85 Meter), 20 MM Dia.
Q: Weight of 1853 MM Earth Spike?
A: 4.5 Kg.
Q: Size of LT Earthing Wire?
A: 8 SWG (4MM)
Q: 8 SWG Wire Weight?
A: 102 gms/Meter
Q: How deep is Earth Spike Underground?
A: 500 mm
Q: Size of Flat using in DTR Earthing?
A: 25x3 MM
Q: Pipe to Pipe Distance for Pipe Earthing?
A: 3 Meter.
Q: Pipe Earthing Length?
A: 3050 MM
Q: Pipe Earthing Dia?
A: 40 MM
Q: How much earthing wire is required for 8 mtr single pole?
A: 8 SWG- 1.2 Kg. 6 SWG- 1.7 Kg.
Q: Pole to Earthing Distance?
A: 2000 MM (2 Meter)
A: 25x3 MM
Q: Pipe to Pipe Distance for Pipe Earthing?
A: 3 Meter.
Q: Pipe Earthing Length?
A: 3050 MM
Q: Pipe Earthing Dia?
A: 40 MM
Q: How much earthing wire is required for 8 mtr single pole?
A: 8 SWG- 1.2 Kg. 6 SWG- 1.7 Kg.
Q: Pole to Earthing Distance?
A: 2000 MM (2 Meter)
Q: Size of HT Earthing wire?
A: 6 SWG (5MM)
Q: 6 SWG Wire Weight?
A: 146 gms./Meter
A: 6 SWG (5MM)
Q: 6 SWG Wire Weight?
A: 146 gms./Meter
Also Read : Power Project Interview Question and Answer
Project Related FULL FORM
Q: PROJECT full form?
A: Planning Resource Operation Joint-effort Engineering Co-operation Technique
Q: PMO full form?
A: Project Management Office
Q: PO full form?A: Project Management Office
A: Purchase Order
Q: BG full form?
A: Bank Guaranty
Q: JCR full form?
A: Job Cost Report
Q: D.I full form?
A: Delivery Instruction
Q: SBD full form?
A: Standard Bidding Documents
Q: ACSR full form?
A: Aluminum Conductor Steel Reinforced
Q: RCC full form?
A: Reinforced Cement Concrete
Q: PVC full form?
A: Poly Vinyl Chloride
Q: PLCC full form?
A: Power Line Carrier Communication
Q: JMC full form?
A: Joint Measurement Certificate
Q: PG CLAMP full form?
A: Parallel Groove Clamps
Q: VCB full form?
A: Vacuum Circuit Breaker
Q: CT full form?
A: Current Transformer
Q: DVC full form?
A: Damodor Vally Corporation
Q: ABC full for?
A: Aerial Bunched Cable
Q: TPGO full form?
A: Triple Pole Gang Operating
Q: AACSR full form?
A: Aluminum Alloy Conductor Steel Reinforced
Q: BDV full form?
A: Break Down Voltage
Q: RCCB full form?
A: Residual Current Circuit Breaker
Q: UPS full form?
A: Uninterrupted Power Supply
Q: LTDB full form?
A: Low Tension Distribution Box
Q: MLDB full form?
A: Main Lighting Distribution Board
Q: CBCU full form?
A: Circuit Breaker Control Unit
Q: EHV full form?
A: Extra High Voltage
Q: GIS full form?
A: Gas Insulated Substation
Q: MVA full form?
A: Mega Volt Ampere
Q: LA full form?
A: Lightning Arrester
Q: OLR full form?
A: Over Load Relay
Q: MV full form?
A: Medium Voltage
Q: HRC full form?
A: High Rupturing Capacity Fuse
Q: AMR full form?
A: Automated Meter Reading
Q: FMS full form?
A: Feeder Monitoring System
Q: G.O Switch full form?
A: Gang Operated Switch
Q: A.B Switch full form?
A: Air Break Switch
Q: IEEMA full form?
A: Indian Electrical & Electronics Manufacturers' Association
Q: SMC full form?
A: Sheet Molding Compound Box
Q: PF full form?
A: Provident Fund
Q: PDF full form?
A: Portable Document Format
Q: PESTLE full form?
A: Political, Economical, Social, Technological, Legal, Environmental
Q: FIR full form?
A: First Information Report
Q: ASAP full form?
A: As Soon As Possible
Q: CAD full form?
A: Computer Added Drawing
Q: LA full form?
A: Letter of Award
Q: APDRP full form?
A: Accelerated Power Development and Reforms Program
Q: CMD full form?
A: Chairman and Managing Director
Q: CEO full form?
A: chief executive officer
Q: DPR full form?
A: Detailed Project Report
Q: NCR full form?
A: Non Compliance Report
Q: JIR full form?
A: Joint Inspection Report
Q: FQP full form?
A: Field Quality Plan
Q: PDCA full form?
A: Plan Do Check Act
Q: NSC full form?
A: National Safety Council
Q: PTP full form?
A: Pre Task Plan
Q: LOI full form?
A: Letter of Indent
Related Keyword :
RE Project Interview Questions and Answers
Power Project Interview Questions and Answers
Rural Electrification Engineer Interview Questions
WBSEDCL Project Interview Questions and Answers
WBSEDCL Project Questions and Answers
RE Project Questions Answers
Power Project Questions Answers
RE Project Related full form
Power Project Related full form